Chinch bugs turned the St. Augustine into straw in Celebration (34747). The ARC will photograph it near Market Street, Town Center, and the village fronts. Spray will not bring dead turf back. We tear it out and replace it in 3–7 days. $1.50–$3.00 per sq ft. Call (407) 674-2841.

Not Reunion. Disney-planned town, Town Center and the villages. Tight hoa lots photographed from the sidewalk.

Celebration: Celebration village streets (34747)

Controllers locked to watering days; one dry zone fails the photo. Dry, hot St. Augustine along the driveway and sidewalk is the usual kill. Green around the edges and straw in the sun is chinch, not a fertilizer miss.

chinch is not drought on this street — Celebration village streets (34747)

Treat if there are still live bugs. Then tear out the dead. New sod on top of straw fails. St. Augustine sod in Celebration is the grass we roll back unless your street is truly something else.

For Celebration, tear out the yellow edge before new pads on Celebration village streets (34747)

$1.50–$3.00 per sq ft installed, about $1,500–$3,000 per 1,000 sq ft. Usually 3–7 days.

Full install: sod installation in Celebration. If the sunny zone never comes on, that is irrigation repair in Celebration, not more sod. Neighbor chinch job: Reunion chinch-bug-sod.