Celebration is Disney-planned 34747 — Town Center, Market Street, and the villages — not Reunion resort gates. HOA photographs the full front. Rip the failed turf, fix grade and water, lay street-match sod. Not a pallet on dead grass. $1.50–$3.00 per sq ft, usually 3–7 days. Call (407) 674-2841.
What Celebration replacement actually needs
- St. Augustine or Lobo Zoysia — never Bahia on a village street
- Cups pass before anyone rolls a pallet
- Water fixed first if a zone is dead — see irrigation repair in Celebration
- Same crew as Reunion sod replacement and Celebration sod install
Walk, rip, cup-test — then sod
- Walk the Celebration lot: sun, slope, ARC strip, water source.
- Fix the cause — rip failed turf, grade, water.
- Match the neighbors so the next letter does not come back.
- Replacement stays on this URL. New pad with no turf: sod installation in Celebration.
Related: St. Augustine in Celebration, patch and repair, storm repair.
Call (407) 674-2841.