Standing water, swales, French drains, and regrade before sod. Osceola/Polk/Lake line lots with mixed HOA and large-lot demand.

Sod still prices $1.50–$3.00 per square foot when we install it after this work. Pair with sod installation in Four Corners.

Four Corners: Do US-27 / 192 county-line lots pond because two counties grade them differently

Do US-27 / 192 county-line lots pond because two counties grade them differently?

Yes. County-line meters in Four Corners do not set the same fall. We drain this lot. (407) 674-2841.

Is a Four Corners French drain the same as a Kissimmee downtown job?

No. US-27 / 192 is not downtown Kissimmee. (407) 674-2841.

Can a rental take delivery while the 27-side pad is still soft?

No. Pallets wait until the Four Corners pad dries. (407) 674-2841.